414-351-1999

More Heating BTUs Please

by

Over here in Air Flow’s engineering department, we get to selections VAV boxes for engineers and contractors.  Thanks for sending them our way. 

Of course, once the selections get to lower heating water temperatures, it takes longer.  The terminal boxes can’t meet all the engineer’s traditional criteria of heat output vs. pressure drop.

You know this yourself, right? 

Solve for BTUs, leaving water temperature, leaving air temperature, air pressure drop, water pressure drop, etc. 

Round and round we go, solving for different criteria, hoping to solve a problem that can’t be solved conventionally.

Just can’t get any more heat out of that coil.  More please!

Starting on December 3rd, come and get more. 

See you in class.

You are invited to "Next Generation Terminal Box Offering"

This is a remote-only attendance class.

When: December 3, 2024 10:00 AM CT
Topic: Next Generation Terminal Box Offering
Please register for remote attendance with the link
Facilitators: Tom Gelin & Suthan Nair Prakashah, Air Flow, Inc., and Mark Mahon Price Industries
PDH credits available: 2

All the best,

Tom Gelin

Air Flow Inc.

8355 West Bradley Road Milwaukee, WI 53223

414-351-1999

Share This